Preparing the Kiosk for Installation

Move the kiosk to its approximate installation site using a suitable lifting device. Verify that this position permits access to the AC Power Receptacle and LAN Cable. To avoid damage to the kiosk and the premises, the kiosk should be moved with its packaging intact.

Refer to the NCR SelfServ™ XK22 (2246) Site Preparation Guide (BCC5-0000-5390) for details of the kiosk dimensions, weights, and clearances required for moving the kiosk in a confined space.

Warning: Only qualified persons, trained in the moving of heavy items and using suitable equipment as required by local health and safety laws, should attempt to move the Kiosk. Unqualified persons trying to move the Kiosk risk severe injury.